Skip to main content

Projects

Driven By Trust In Every Step

Discover how VMP powers businesses through successful, high-performance energy projects.

+

Satisfied Clients

+

Projects Completed

+

Resellers

What Our Clients Say

Real experiences from partners who trust our solutions.

Battery bagus semua garansi 1 tahun harga juga terjangkau cocok untuk UPS dan solar panel

Adinda Candra

Barang berkualitas harganya terjangkau murah untuk pemakaian.

Naruto

Tempat baaterai favorit sejak 2020. Kualitas mantap, harga bersahabat, bisa nego kalo beli banyak. Encinya juga baik dan informatif. Gak salah repeat order berkali-kali.

Muhammad Fadli

Tempat mencari aki VMP & YUASA. CSB juga ada. Tempatnya bersih, pelayanan ramah.

Achmad Famil Maududi

Batt dan akii lengkap dari ukuran kecil sampai besar. Pelayanan sangat ramah. Harga bersaing

Mei Haryati

Our Projects

Explore our past projects across various industries.
5 June 2026
Industrial Projects
An off-grid solar power system (PLTS) was installed for a 210-foot barge at Tanjung Priok Port, Jakarta. An off-grid solar power system operates independently without being connected to the electricity grid.
28 January 2026
Commercial Projects
Procurement of 40 units of VRLA Gel batteries 12V 100Ah for a Riello 100kVA UPS system.
5 January 2026
Industrial Projects
Installation of VMP Lithium 384V 50A batteries for a Riello 30kVA UPS and VMP Lithium 409.6V 314Ah batteries for a Riello 160kVA UPS at the Savoria factory (a subsidiary of Djarum) in Kudus.
5 January 2026
Industrial Projects
VMP’s Battery Energy Storage System (BESS) uses a 409.6V 100Ah LiFePO4 battery with up to 4,000 cycle times for a Riello 160kVA UPS. UPS systems powered by lithium batteries offer significant advantages, including a much longer service life (up to 4,000 cycles) and enhanced stability through an integrated Battery Management System (BMS).
4 December 2025
Industrial Projects
Installation of a 9440Wp hybrid solar power system with VMP 40kWh lithium batteries at a new residence in Pluit, Jakarta. The solar system consists of 1 unit of VMP 3-phase 12kW inverter and 8 units of Lithium 51.2V 100Ah batteries.
4 December 2025
Personal Projects
Installation of a 9440Wp hybrid solar power system with VMP 40kWh lithium batteries at a new residence in Pluit, Jakarta. The solar system consists of 1 unit of VMP 3-phase 12kW inverter and 8 units of Lithium 51.2V 100Ah batteries.
20 November 2025
Industrial Projects
Installation of a 2360Wp off-grid solar power system with VMP Lithium 51.2V 100Ah batteries in Mamberamo Regency, Papua. The purpose of the solar system is to provide electricity supply for water pumps.
29 September 2025
Commercial Projects
Procurement of 24 units of OPzV Tubular Gel batteries 2V 1000Ah for solar power system requirements.
23 September 2025
Industrial Projects
Installation of a 9440Wp off-grid solar power system with VMP 40kWh lithium batteries in Mamberamo Regency, Papua, across 2 locations. This project was initiated by the Fisheries Department to provide electricity supply for refrigerators used in ice production.
25 February 2023
Commercial Projects
Procurement of 400 units of VMP VRLA batteries 12V 65Ah.
5 June 2026
Industrial Projects
An off-grid solar power system (PLTS) was installed for a 210-foot barge at Tanjung Priok Port, Jakarta. An off-grid solar power system operates independently without being connected to the electricity grid.
5 January 2026
Industrial Projects
Installation of VMP Lithium 384V 50A batteries for a Riello 30kVA UPS and VMP Lithium 409.6V 314Ah batteries for a Riello 160kVA UPS at the Savoria factory (a subsidiary of Djarum) in Kudus.
5 January 2026
Industrial Projects
VMP’s Battery Energy Storage System (BESS) uses a 409.6V 100Ah LiFePO4 battery with up to 4,000 cycle times for a Riello 160kVA UPS. UPS systems powered by lithium batteries offer significant advantages, including a much longer service life (up to 4,000 cycles) and enhanced stability through an integrated Battery Management System (BMS).
4 December 2025
Industrial Projects
Installation of a 9440Wp hybrid solar power system with VMP 40kWh lithium batteries at a new residence in Pluit, Jakarta. The solar system consists of 1 unit of VMP 3-phase 12kW inverter and 8 units of Lithium 51.2V 100Ah batteries.
20 November 2025
Industrial Projects
Installation of a 2360Wp off-grid solar power system with VMP Lithium 51.2V 100Ah batteries in Mamberamo Regency, Papua. The purpose of the solar system is to provide electricity supply for water pumps.
23 September 2025
Industrial Projects
Installation of a 9440Wp off-grid solar power system with VMP 40kWh lithium batteries in Mamberamo Regency, Papua, across 2 locations. This project was initiated by the Fisheries Department to provide electricity supply for refrigerators used in ice production.
28 January 2026
Commercial Projects
Procurement of 40 units of VRLA Gel batteries 12V 100Ah for a Riello 100kVA UPS system.
29 September 2025
Commercial Projects
Procurement of 24 units of OPzV Tubular Gel batteries 2V 1000Ah for solar power system requirements.
25 February 2023
Commercial Projects
Procurement of 400 units of VMP VRLA batteries 12V 65Ah.
4 December 2025
Personal Projects
Installation of a 9440Wp hybrid solar power system with VMP 40kWh lithium batteries at a new residence in Pluit, Jakarta. The solar system consists of 1 unit of VMP 3-phase 12kW inverter and 8 units of Lithium 51.2V 100Ah batteries.
One Stop Energy Solution for a
Powerful Tomorrow.
Follow us on
© 2026 PT Valencia Mega Power (VMP) - One Stop Energy Solutions. All Rights Reserved.